ASHRAE 90.1 1.11 changelog
Last modified by WikiBot on 2026/07/24 10:23
ASHRAE 90.1 1.11 changelog
Changes in A901 1.11 (rel. to 1.10)
- The user has the ability to run the baseline building model in only one direction.
- The baseline building models simulation can now run with time-split parallelization.
- The pressure drop adjustments for heat recovery, runaround coil loop and evaporative cooling are only applied if the air-handling unit contains a heat recovery unit (checked automatically in the baseline building model).
- Improvements in the zone table information. Total areas are now presented for conditioned, heated-only, semi-heated and unconditioned spaces.
- The user can now visualize the "Belong to floor/group" parameter in the 3D-view.
- Two columns added in the AHU table showing the system type and the served area.
- Manuals are updated.
Fixed bugs
- Fixed the central heating/cooling system when purchased chilled water is used.
- Fixed mapping of "BB airflow through device"
- Fixed a bug in system 5.
- Fixed a minor bug in system 8.
- Update constructions of walls and roofs that are connected to ground correctly (came up after ICE 4.8).
- Fixed systems 6 and 8 so that they are compatible with variable setpoints.
- Other minor fixes.