Miljöbyggnad 1.02 changelog
Last modified by WikiBot on 2026/07/24 10:24
Miljöbyggnad 1.02 changelog
New in Miljöbyggnad 1.02 (relative to 1.01)
- Daylight plane names changed to "Användardefinierade".
- Simulation date of each indicator run is now written in the report heads.
- Removal of Column "Plan" in reports for indicator runs 3,10,11,12.
- Changed to include also latent heat in "Bortförd värme, ventilation" for indicator 11.
Fixed bugs
- Wrong text: Report indicator2, 2.8: "Hantering av köldbryggor om *<* 20% av transm.förluster".
- Wrong text: Report indicator10, Indata 10.18: "fönsters U-värde".
- g-syst was taken from possibly wrong month, for indicator runs 3 and 11.
- Reporting of schedule was sometimes wrong if more than two schedlues were used in a room.
- Skylights crashed the report generation.
- Improvement of routines for automatic placement of occupant for indicators 10 and 11.
- Total grade was Silver instead of Gold for indicator 12.